[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Kruibeke
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: KT Projects
Part #2:
- Part: Braemland I
- City: Kruibeke
- Commissioning:

- 3 turbines: Dewind D8.0 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Fortech
- Operator: Wase Wind
- Owner:

- Source:

- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 22.1 %
- Expected production: 31,770 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Braemland II
- City: Beveren
- Commissioning:

- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: KT Projects
- Operator: Wase Wind
- Source:

- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 25.2 %
- Expected production: 24,200 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 10' 42.8"
- Longitude: 4° 16' 42.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Braemland I
- Latitude: 51° 10' 42.8"
- Longitude: 4° 16' 42.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Braemland II
- Latitude: 51° 10' 52.5"
- Longitude: 4° 16' 35.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: