[Back to previous page]
Generalities
|
|
Details
- City: Algermissen
- Commissioning:

- 2 turbines: Bonus B76/2000 (power 2 000 kW, diameter 76 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, January 26 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.2 %
- Expected production: 21,330 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 15' 12.3"
- Longitude: 9° 58' 9.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 15 January 2019
Complete/correct this sheet: