Wind farms
Teixeiro (Portugal)| Teixeiro (Portugal) |
|
| Operational (14 MW) |

| Country | Portugal |
| County/Zone | Porto (Norte) |
| City | Baiao |
| Wind farm type | Onshore wind farm |

![]() | 4 MW commissioned |
![]() | 4 MW commissioned |
![]() | 4 MW commissioned |
![]() | 2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Repower MM82 (x 4) |
| Operational | Repower MM70 (x 3) |

![]() | |

| Part | Teixeiro I |
| City | Baiao |
| Commissioning | ![]() |
| Turbines | 2x Repower MM70 (power 2,000 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 11' 23.9" - Longitude -7° 53' 23.9" |
| Precise localization | Yes |
| Part | Teixeiro I |
| City | Baiao |
| Commissioning | ![]() |
| Turbines | 2x Repower MM82 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 11' 23.9" - Longitude -7° 53' 23.9" |
| Precise localization | Yes |
| Part | Teixeiro II |
| City | Baiao |
| Commissioning | ![]() |
| Turbines | 2x Repower MM82 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 11' 43.1" - Longitude -7° 53' 21.8" |
| Precise localization | Yes |
| Part | Teixeiro II |
| City | Baiao |
| Commissioning | ![]() |
| Turbine | 1x Repower MM70 (power 2,000 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 11' 43.1" - Longitude -7° 53' 21.8" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Seixinhos (2 km) Mafômedes (4 km) Chorida 1 (4 km) Chorida 2 (4 km) Penedo Ruivo (5 km) Baiao (6 km) Pena Suar (6 km) Portal da Freita (8 km) Meadas (10 km) Abogalheira (12 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Porto (Norte) : 65.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||