[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Saint-Jean-de-Liversay, Ferrières d’Aunis, Saint-Cyr-du-Doret
- Commissioning:

- 9 turbines: Acciona AW-1500/82 (power 1 500 kW, diameter 82 m)
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
- Developer: Valorem
- Operator: Valorem
- Owner:

Production forecast
- From Saturday, March 25 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 70.2 %
- Expected production: 227,290 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Landrais, Chambon
- Commissioning:

- 3 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:

- Total nominal power: 7,050 kW
- Operational
- Onshore wind farm
- Developer: BayWa R.E.
- Owner:

- Source:

- Source:

Localisation
Part #1:
- Latitude: 46° 14' 25.2"
- Longitude: -0° 51' 37.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 46° 5' 1.1"
- Longitude: -0° 51' 7.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 October 2022
Complete/correct this sheet: