[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Nortarp
- Commissioning:

- 4 turbines: (manufacturer name not available)
- Total nominal power: 1,320 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 27.5 %
- Expected production: 8,720 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Nortarp
- Commissioning:

- 4 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 30.4 %
- Expected production: 19,290 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Nortarp
- Commissioning:

- 4 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 30.4 %
- Expected production: 19,290 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 47' 59.2"
- Longitude: 8° 32' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 47' 59.2"
- Longitude: 8° 32' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 47' 59.2"
- Longitude: 8° 32' 30"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: