Generalities
|
|
Details
Part #1:
- City: Avignonet
- Commissioning:

- 10 turbines: Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developers: Poweo/Boralex/EED
- Operator: Boralex
- Owner:

- Source:

Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.8 %
- Expected production: 1,590 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Avignonet
- Commissioning:

- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developers: Poweo/Boralex/EED
- Operator: Boralex
- Owner:

- Source:

Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.8 %
- Expected production: 900 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 43° 22' 22.5"
- Longitude: 1° 47' 51.4"
- Altitude: 240/270 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 43° 22' 26.7"
- Longitude: 1° 48' 8.1"
- Altitude: 263/267 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures
Update for this sheet: 15 March 2023
Complete/correct this sheet: