[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Trojmezi A
- Commissioning:

- 1 turbine: Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Farma Trojmezi
Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 31 %
- Expected production: 4,460 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Trojmezi A
- Commissioning:

- 1 turbine: Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Farma Trojmezi
Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 44.4 %
- Expected production: 6,400 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Trojmezi B
- Commissioning:

- 1 turbine: Vestas
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Operator: Farma Trojmezi
Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 54.3 %
- Expected production: 19,540 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Trojmezi A
- Latitude: 50° 18' 58"
- Longitude: 12° 9' 9.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Trojmezi A
- Latitude: 50° 18' 58"
- Longitude: 12° 9' 9.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Trojmezi B
- Latitude: 50° 18' 58"
- Longitude: 12° 9' 9.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 December 2020
Complete/correct this sheet: