[Back to previous page]
Details
- Commissioning:

- 2 turbines: Winwind WWD-3-100 (power 3 000 kW, diameter 100 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Operator: VTE Pchery
Production forecast
- From Wednesday, July 06 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.3 %
- Expected production: 7,670 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 11' 50.9"
- Longitude: 14° 7' 56.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 December 2020
Complete/correct this sheet: