[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Campagne Spêches
- City: Sombreffe
- Commissioning:

- 4 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Eneco
Production forecast
- From Wednesday, May 31 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 46.3 %
- Expected production: 66,730 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Campagne Spêches - Extension
- City: Gembloux, Sombreffe
- Commissioning:

- 2 turbines: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Eneco
Production forecast
- From Wednesday, May 31 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 41.2 %
- Expected production: 29,630 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Campagne Spêches
- Latitude: 50° 32' 35.7"
- Longitude: 4° 37' 55.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Campagne Spêches - Extension
- Latitude: 50° 32' 49.3"
- Longitude: 4° 37' 34.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: