[Back to previous page]
Details
- City: Bejstrup
- Commissioning:

- 10 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, June 30 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.9 %
- Expected production: 3,710 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 57° 1' 27.2"
- Longitude: 9° 20' 21.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 5 July 2018
Complete/correct this sheet: