The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Berloz II (Belgium)


[Back to previous page]

Belgium wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Berloz
  • Commissioning: 2016
  • 3 turbines: Gamesa G114/2500 (power 2 500 kW, diameter 114 m)
  • Hub height: 93 m
  • Total nominal power: 7,500 kW
  • Operational
  • Onshore wind farm
  • Operator: Eneco
  • Owner: Eneco

       Production forecast

  • From Thursday, July 09 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.1 %
  • Expected production: 170 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Berloz, Geer
  • Commissioning: 2016
  • 4 turbines: Gamesa G114/2500 (power 2 500 kW, diameter 114 m)
  • Hub height: 93 m
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Operator: EDF Luminus
  • Owner: EDF Luminus

       Production forecast

  • From Thursday, July 09 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.1 %
  • Expected production: 160 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 41' 32.8"
  • Longitude: 5° 11' 19.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 50° 41' 12.7"
  • Longitude: 5° 12' 5.1"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 15 January 2018
Complete/correct this sheet:



The Wind Power
contact@thewindpower.net
All rights reserved - 2005-2020

General Terms and Conditions of Sale - Partners
NEWSLETTER