[Back to previous page]
Details
- City: Ostergard
- Commissioning:

- 2 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 80.5 %
- Expected production: 63,720 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 56° 25' 51.2"
- Longitude: 8° 43' 30.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 April 2019
Complete/correct this sheet: