Generalities
|
|
Details
Part #1:
- City: Bjerndrup
- Commissioning:

- 2 turbines: Neg Micon NM52/900 (power 900 kW, diameter 52.2 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, January 27 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 19.9 %
- Expected production: 8,610 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Bjerndrup
- Commissioning:

- 1 turbine: Neg Micon NM52/900 (power 900 kW, diameter 52.2 m)
- Hub height:

- Total nominal power: 900 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, January 27 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 14.7 %
- Expected production: 3,170 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Bjerndrup
- Commissioning:

- 2 turbines: Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height:

- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, January 27 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 14.6 %
- Expected production: 5,590 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 19' 13.8"
- Longitude: 9° 21' 46"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 55° 19' 35.3"
- Longitude: 9° 22' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 19' 35.3"
- Longitude: 9° 22' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 27 May 2019