[Back to previous page]
Details
- City: Bruserup By - Væggerløse
- Commissioning:

- 1 turbine: Neg Micon NM52/900 (power 900 kW, diameter 52.2 m)
- Hub height:

- Total nominal power: 900 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 80.6 %
- Expected production: 17,420 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 54° 40' 16.2"
- Longitude: 11° 53' 36.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 September 2017
Complete/correct this sheet: