Kobenhoved (Denmark)| Kobenhoved (Denmark) |
|
| Operational (2,55 MW) - Dismantled (0,45 MW) |

| Country | Denmark |
| County/Zone | Vejen (Syddanmark) |
| City | Kobenhoved |
| Wind farm type | Onshore wind farm |

![]() | 0.3 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.3 MW decommissioned |
![]() | 0.15 MW decommissioned |
![]() | 2.55 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V52/850 (x 3) |
| Dismantled | Nordtank 150XLR (x 3) |

![]() | |

| City | Kobenhoved |
| Commissioning | ![]() |
| Turbines | 3x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 2,550 kW |
| Status | Operational |
| Coordinates | Latitude 55° 25' 20.1" - Longitude 9° 7' 30" |
| Precise localization | Yes |
| City | Kobenhoved |
| Commissioning | ![]() |
| Turbines | 2x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2007/07) |
| Coordinates | Latitude 55° 25' 20.1" - Longitude 9° 7' 30" |
| Precise localization | No |
| City | Kobenhoved |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2007/07) |
| Coordinates | Latitude 55° 25' 20.1" - Longitude 9° 7' 30" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Skodborg (2 km) Maltbæk (6 km) Dover (Vejen) (7 km) Gamst (9 km) St. Andst (10 km) Tornum (10 km) Gesten (11 km) Nagbol (11 km) Brændstrup (11 km) Orsted (Haderslev) (11 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Vejen (Syddanmark) : 65.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 29 June 2018 |
||