[Back to previous page]
Details
Part #1:
- City: Binderup
- Commissioning:

- 2 turbines: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 23.4 %
- Expected production: 8,420 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Binderup
- Commissioning:

- 1 turbine: Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 17.2 %
- Expected production: 2,480 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 56° 59' 18.3"
- Longitude: 9° 41' 48.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 56° 59' 18.3"
- Longitude: 9° 41' 48.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: