Part #1:
- City: Hemmeshoj
- Commissioning:

- 3 turbines: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 19.3 %
- Expected production: 10,410 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hemmeshoj
- Commissioning:

- 3 turbines: Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Operator: Orsted
- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 18.3 %
- Expected production: 9,900 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Hemmeshoj
- Commissioning:

- 3 turbines: Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15 %
- Expected production: 5,400 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 16' 3.5"
- Longitude: 11° 21' 43.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 20' 48"
- Longitude: 11° 17' 20.6"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 20' 52.2"
- Longitude: 11° 16' 42.2"
- Geodetic system: WGS84
- Precise location: yes