Details
Part #1:
- City: Fjaltring
- Commissioning:

- 3 turbines: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 89.1 %
- Expected production: 48,130 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Fjaltring
- Commissioning:

- 1 turbine: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 92.5 %
- Expected production: 16,650 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Fjaltring
- Commissioning:

- 1 turbine: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 750 kW
- Dismantled (2020/10)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 56° 27' 58.8"
- Longitude: 8° 8' 40"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 56° 27' 58.8"
- Longitude: 8° 8' 40"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 56° 27' 58.8"
- Longitude: 8° 8' 40"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 June 2021