Generalities
|
|
Details
- City: Inkoo
- Commissioning: 2004/09
- 1 turbine: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
- Hub height: 65 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Operator: Saba Wind Oy
- Owner: Saba Wind Oy
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 46.3 %
- Expected production: 22,250 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 59° 59' 4.1"
- Longitude: 23° 50' 59.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 30 May 2018
Complete/correct this sheet: