[Back to previous page]
Generalities
|
|
Details
- City: Uglerup
- Commissioning:

- 2 turbines: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Operator: Orsted
- Source:

Localisation
No data.
Update for this sheet: 0
Complete/correct this sheet: