[Back to previous page]
Details
Part #1:
- City: Ullerslev
- Commissioning:

- 2 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.5 %
- Expected production: 1,990 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Ullerslev
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.2 %
- Expected production: 1,300 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 22' 7.8"
- Longitude: 10° 37' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 55° 22' 7.8"
- Longitude: 10° 37' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 13 June 2018
Complete/correct this sheet: