Generalities
|
|
Details
Part #1:
- City: Handest
- Commissioning:

- 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, January 17 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 12 %
- Expected production: 6,500 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Handest
- Commissioning:

- 4 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, January 17 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 13.9 %
- Expected production: 8,800 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Handest
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, January 17 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 21.3 %
- Expected production: 3,830 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 56° 34' 6.9"
- Longitude: 9° 49' 16.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 34' 6.9"
- Longitude: 9° 49' 16.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 56° 34' 6.9"
- Longitude: 9° 49' 16.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: