[Back to previous page]
Generalities
|
|
Details
- City: Krokom
- Commissioning:
- 12 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Hub height:
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developer: Orsted
- Operators: Orsted/Arise Windpower
Localisation
- Latitude: 63° 45' 32.4"
- Longitude: 13° 35' 9.9"
- Altitude: 710 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: