[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Kalhave
- Commissioning:

- 2 turbines: Wincon W600/45 (power 600 kW, diameter 45 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.7 %
- Expected production: 7,130 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Kalhave
- Commissioning:

- 2 turbines: Wincon W600/45 (power 600 kW, diameter 45 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.7 %
- Expected production: 7,130 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 51' 18.8"
- Longitude: 9° 36' 45.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 55° 51' 18.8"
- Longitude: 9° 36' 45.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: