Wind farms
Mellerup (Denmark)| Mellerup (Denmark) |
|
| Operational (4,2 MW) |

| Country | Denmark |
| County/Zone | Tonder (Syddanmark) |
| City | Mellerup |
| Wind farm type | Onshore wind farm |

![]() | 1.2 MW commissioned |
![]() | 2.4 MW commissioned |
![]() | 0.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Nordex N43/600 (x 7) |

![]() | |

| City | Mellerup |
| Commissioning | ![]() |
| Turbines | 4x Nordex N43/600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 2,400 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 8.9" - Longitude 9° 12' 6.9" |
| Precise localization | Yes |
| City | Mellerup |
| Commissioning | ![]() |
| Turbine | 1x Nordex N43/600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 8.9" - Longitude 9° 12' 6.9" |
| Precise localization | Yes |
| City | Mellerup |
| Commissioning | ![]() |
| Turbines | 2x Nordex N43/600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 8.9" - Longitude 9° 12' 6.9" |
| Precise localization | Yes |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hellevad (Aabenraa) (1 km) Klovtoft (5 km) Agerskov (6 km) Kasso (7 km) Bovlund (7 km) Branderup (8 km) Nr. Ønlev (9 km) Sdr. Onlev (9 km) Oster Terp (9 km) Hyrup (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Tonder (Syddanmark) : 185.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 June 2018 |
||