Part #1:
- City: Starup
- Commissioning:

- 1 turbine: Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 16.9 %
- Expected production: 2,440 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Starup
- Commissioning:

- 1 turbine: Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 19.2 %
- Expected production: 2,760 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Starup
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 150 kW
- Dismantled (2011/08)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 55° 38' 44.3"
- Longitude: 8° 48' 30.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 38' 44.3"
- Longitude: 8° 48' 30.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 38' 44.3"
- Longitude: 8° 48' 30.9"
- Geodetic system: WGS84
- Precise localization: no