Wind farms
Skast (Denmark)| Skast (Denmark) |
|
| Operational (1,8 MW) |

| Country | Denmark |
| County/Zone | Tonder (Syddanmark) |
| City | Skast |
| Wind farm type | Onshore wind farm |

![]() | 1.2 MW commissioned |
![]() | 0.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V44/600 (x 3) |

![]() | |

| City | Skast |
| Commissioning | ![]() |
| Turbines | 2x Vestas V44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordinates | Latitude 55° 3' 33.6" - Longitude 8° 41' 38.6" |
| Precise localization | No |
| City | Skast |
| Commissioning | ![]() |
| Turbine | 1x Vestas V44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 55° 3' 33.6" - Longitude 8° 41' 38.6" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Husum-Ballum (2 km) Rejsby-Ballum (3 km) Rejsby (3 km) Randerup (4 km) Koldby (4 km) Abterp (5 km) Harres (5 km) Borg (7 km) Mollerup (Tonder) (7 km) Brede (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Tonder (Syddanmark) : 185.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||