[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Bedsted
- Commissioning:

- 1 turbine: Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, March 24 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 74.5 %
- Expected production: 13,420 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Bedsted
- Commissioning:

- 1 turbine: Bonus B33/300 (power 300 kW, diameter 33.4 m)
- Hub height:

- Total nominal power: 300 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, March 24 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 74.5 %
- Expected production: 5,370 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Bedsted
- Commissioning:

- 1 turbine: Neg Micon
- Hub height:

- Total nominal power: 250 kW
- Dismantled (2016/07)
- Onshore wind farm
- Source:

Part #4:
- City: Bedsted
- Commissioning:

- 1 turbine: Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height:

- Total nominal power: 225 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, March 24 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 79.4 %
- Expected production: 4,290 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 56° 50' 24.5"
- Longitude: 8° 19' 20.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 50' 24.5"
- Longitude: 8° 19' 20.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 56° 50' 24.5"
- Longitude: 8° 19' 20.5"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 56° 50' 24.5"
- Longitude: 8° 19' 20.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: