[Back to previous page]
Details
Part #1:
- City: Oddense
- Commissioning:

- 1 turbine: Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.7 %
- Expected production: 670 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Oddense
- Commissioning:

- 2 turbines: Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.6 %
- Expected production: 1,910 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Oddense
- Commissioning:

- 1 turbine: Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Hub height:

- Total nominal power: 300 kW
- Dismantled (2015/05)
- Onshore wind farm
- Source:

Part #4:
- City: Oddense
- Commissioning:

- 1 turbine: Nordtank NTK150/25 (power 150 kW, diameter 24.6 m)
- Hub height:

- Total nominal power: 150 kW
- Dismantled (2015/09)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 56° 38' 57.5"
- Longitude: 8° 55' 59.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 38' 57.5"
- Longitude: 8° 55' 59.1"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 56° 38' 57.5"
- Longitude: 8° 55' 59.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 56° 38' 57.5"
- Longitude: 8° 55' 59.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: