Stenstrup (Denmark)| Stenstrup (Denmark) |
|
| Operational (2,4 MW) - Dismantled (0,25 MW) |

| Country | Denmark |
| County/Zone | Mariagerfjord (Nordjylland) |
| City | Stenstrup |
| Wind farm type | Onshore wind farm |

![]() | 0.25 MW commissioned |
![]() | 1.2 MW commissioned |
![]() | 1.2 MW commissioned |
![]() | 0.25 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Nordtank NTK600/43 (x 4) |
| Dismantled | Micon M530 (x 1) |

![]() | |

| City | Stenstrup |
| Commissioning | ![]() |
| Turbines | 2x Nordtank NTK600/43 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordinates | Latitude 56° 43' 42.7" - Longitude 9° 53' 31" |
| Precise localization | No |
| City | Stenstrup |
| Commissioning | ![]() |
| Turbines | 2x Nordtank NTK600/43 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordinates | Latitude 56° 43' 42.7" - Longitude 9° 53' 31" |
| Precise localization | No |
| City | Stenstrup |
| Commissioning | ![]() |
| Turbine | 1x Micon M530 (power 250 kW, diameter 26 m) |
| Hub height | ![]() |
| Total nominal power | 250 kW |
| Status | Dismantled (2015/03) |
| Coordinates | Latitude 56° 43' 42.7" - Longitude 9° 53' 31" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Fragdrup (3 km) Kielstrup (6 km) Valsgard (7 km) Hondrup (7 km) Rold (7 km) Vive (9 km) Tisteder (10 km) Dostrup (10 km) Rorbæk (Rebild) (11 km) Volstrup-Rorbæk (11 km) | ||
|