Wind farms
Ulsted (Denmark)| Ulsted (Denmark) |
|
| Dismantled (0,8 MW) |

| Country | Denmark |
| County/Zone | Aalborg (Nordjylland) |
| City | Ulsted |
| Wind farm type | Onshore wind farm |

![]() | 0.3 MW commissioned |
![]() | 0.5 MW commissioned |
![]() | 0.3 MW decommissioned |
![]() | 0.5 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Dismantled | Micon M530/24 (x 2) |
| Dismantled | Bonus B23/150 (x 2) |

![]() | |

| City | Ulsted |
| Commissioning | ![]() |
| Turbines | 2x Micon M530/24 (power 250 kW, diameter 24 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Dismantled (2016/11) |
| Coordinates | Latitude 57° 4' 15.2" - Longitude 10° 15' 18.4" |
| Precise localization | No |
| City | Ulsted |
| Commissioning | ![]() |
| Turbines | 2x Bonus B23/150 (power 150 kW, diameter 23 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2016/03) |
| Coordinates | Latitude 57° 4' 15.2" - Longitude 10° 15' 18.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hassing Sogn (4 km) Klitgaard (5 km) Gandrup (5 km) V. Hassing (8 km) Hassing (Aalborg) (8 km) Gaser (8 km) Dronninggard (8 km) Dronninglund (10 km) Kvisselholtgard - Dronninglund (10 km) Overdorf fjerding - Dronninglund (10 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Aalborg (Nordjylland) : 170.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||