Wind farms
Torring (Lemvig) (Denmark)| Torring (Lemvig) (Denmark) |
|
| Operational (0,45 MW) - Dismantled (0,2 MW) |

| Country | Denmark |
| County/Zone | Lemvig (Midtjylland) |
| City | Torring |
| Wind farm type | Onshore wind farm |

![]() | 0.2 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.2 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V29/225 (x 1) |
| Operational | Vestas V27/225 (x 1) |
| Dismantled | Vestas V25/200 (x 1) |

![]() | |

| City | Torring |
| Commissioning | ![]() |
| Turbine | 1x Vestas V29/225 (power 225 kW, diameter 29 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Operational |
| Coordinates | Latitude 56° 34' 3.8" - Longitude 8° 15' 27.4" |
| Precise localization | No |
| City | Torring |
| Commissioning | ![]() |
| Turbine | 1x Vestas V25/200 (power 200 kW, diameter 25 m) |
| Hub height | ![]() |
| Total nominal power | 200 kW |
| Status | Dismantled (2009/12) |
| Coordinates | Latitude 56° 34' 3.8" - Longitude 8° 15' 27.4" |
| Precise localization | No |
| City | Torring |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Operational |
| Coordinates | Latitude 56° 34' 3.8" - Longitude 8° 15' 27.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hove (Lemvig) (2 km) Hovedgard (Lemvig) (3 km) Thyboron Havn (4 km) Vandborg (6 km) Rom (7 km) Harboore (7 km) Lomborg (7 km) Enlige Garde - Lomborg (7 km) Dybe (8 km) Ramme (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Lemvig (Midtjylland) : 285.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 April 2019 |
||