Wind farms
Lystrup (Denmark)| Lystrup (Denmark) |
|
| Operational (0,75 MW) - Dismantled (0,2 MW) |

| Country | Denmark |
| County/Zone | Norddjurs (Midtjylland) |
| City | Lystrup |
| Wind farm type | Onshore wind farm |

![]() | 0.2 MW commissioned |
![]() | 0.75 MW commissioned |
![]() | 0.2 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Neg Micon NM48/750 (x 1) |
| Dismantled | Vestas V25/200 (x 1) |

![]() | |

| City | Lystrup |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 56° 29' 54.5" - Longitude 10° 27' 55" |
| Precise localization | No |
| City | Lystrup |
| Commissioning | ![]() |
| Turbine | 1x Vestas V25/200 (power 200 kW, diameter 25 m) |
| Hub height | ![]() |
| Total nominal power | 200 kW |
| Status | Dismantled (2012/05) |
| Coordinates | Latitude 56° 29' 54.5" - Longitude 10° 27' 55" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hevring (5 km) Torslev (Norddjurs) (8 km) Hollanadsbjerg - Orsted (12 km) Orsted (Norddjurs) (12 km) Hollandsbjerg (13 km) Virring (Randers) (15 km) Bonnerup (16 km) Langkastrup (16 km) Sodring (17 km) Lime (18 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Norddjurs (Midtjylland) : 57.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||