[Back to previous page]
Details
- City: Kirkerup
- Commissioning:

- 1 turbine: Danwin 23/180 (power 180 kW, diameter 23.2 m)
- Hub height:

- Total nominal power: 180 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 84.7 %
- Expected production: 3,660 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 55° 21' 29.7"
- Longitude: 11° 29' 37"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: