[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Forlev
- Commissioning:

- 1 turbine: Wind World W2320/200 (power 200 kW, diameter 23 m)
- Hub height:

- Total nominal power: 200 kW
- Dismantled (2007/01)
- Onshore wind farm
- Source:

Part #2:
- City: Forlev
- Commissioning:

- 1 turbine: Wind World W2320/200 (power 200 kW, diameter 23 m)
- Hub height:

- Total nominal power: 200 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Monday, March 01 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 23.3 %
- Expected production: 1,120 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Forlev
- Commissioning:

- 1 turbine: Wind World W2320/160 (power 160 kW, diameter 23.2 m)
- Hub height:

- Total nominal power: 160 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Monday, March 01 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.5 %
- Expected production: 860 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 22' 19.7"
- Longitude: 11° 15' 37.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 22' 19.7"
- Longitude: 11° 15' 37.2"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 22' 19.7"
- Longitude: 11° 15' 37.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 26 April 2019
Complete/correct this sheet: