[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Boeslum
- Commissioning:

- 1 turbine: Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 31.7 %
- Expected production: 4,560 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Boeslum
- Commissioning:

- 1 turbine: Bonus
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 37.4 %
- Expected production: 4,490 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Boeslum
- Commissioning:

- 1 turbine: Nordtank 150XLR (power 150 kW, diameter 24.6 m)
- Hub height:

- Total nominal power: 150 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 38.1 %
- Expected production: 1,370 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Boeslum
- Commissioning:

- 1 turbine: Nordtank
- Hub height:

- Total nominal power: 130 kW
- Dismantled (2002/08)
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 56° 12' 7.3"
- Longitude: 10° 42' 40.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 12' 7.3"
- Longitude: 10° 42' 40.1"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 56° 12' 7.3"
- Longitude: 10° 42' 40.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 56° 12' 7.3"
- Longitude: 10° 42' 40.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: