Wind farms
Helberskov (Denmark)| Helberskov (Denmark) |
|
| Dismantled (0,45 MW) |

| Country | Denmark |
| County/Zone | Mariagerfjord (Nordjylland) |
| City | Helberskov |
| Wind farm type | Onshore wind farm |

![]() | 0.3 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.3 MW decommissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Dismantled | DWP D150/22 (x 3) |

![]() | |

| City | Helberskov |
| Commissioning | ![]() |
| Turbines | 2x DWP D150/22 (power 150 kW, diameter 22.2 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2010/06) |
| Coordinates | Latitude 56° 44' 8.7" - Longitude 10° 17' 21" |
| Precise localization | No |
| City | Helberskov |
| Commissioning | ![]() |
| Turbine | 1x DWP D150/22 (power 150 kW, diameter 22.2 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2010/06) |
| Coordinates | Latitude 56° 44' 8.7" - Longitude 10° 17' 21" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Overgard Hgd (7 km) Veddum (8 km) Bjerre (9 km) Udbyneder (9 km) Klattrup (9 km) Udbyover (11 km) Sodring (12 km) Dalbyneder (12 km) Demstrup (13 km) Kastbjerg (13 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Mariagerfjord (Nordjylland) : 110.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||