Generalities
|
|
Details
Part #1:
- City: Hoptrup
- Commissioning:

- 1 turbine: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:

- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
- Source:

Part #2:
- City: Hoptrup
- Commissioning:

- 1 turbine: Nordtank 150XLR (power 150 kW, diameter 24.6 m)
- Hub height:

- Total nominal power: 150 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Tuesday, August 16 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.2 %
- Expected production: 120 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Hoptrup
- Commissioning:

- 1 turbine: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:

- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Tuesday, August 16 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.2 %
- Expected production: 120 kWh
- Values from Weathernews Windcaster solution
Localisation
Part 1 : no data.
Part #2:
- Latitude: 55° 10' 37.3"
- Longitude: 9° 27' 11.8"
- Geodetic system: WGS84
- Precise localization: no
Part 3 : no data.
Update for this sheet: 21 September 2017
Complete/correct this sheet: