Wind farms
Oksendrup (Denmark)| Oksendrup (Denmark) |
|
| Operational (6 MW) - Dismantled (0,45 MW) |

| Country | Denmark |
| County/Zone | Nyborg (Syddanmark) |
| City | Oksendrup |
| Wind farm type | Onshore wind farm |

![]() | 0.45 MW commissioned |
![]() | 0.75 MW commissioned |
![]() | 0.45 MW decommissioned |
![]() | 5.25 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V66/1750 (x 3) |
| Operational | Neg Micon NM48/750 (x 1) |
| Dismantled | Nordtank 150XLR (x 3) |

![]() | |

| City | Oksendrup |
| Commissioning | ![]() |
| Turbines | 3x Vestas V66/1750 (power 1,750 kW, diameter 66 m) |
| Hub height | ![]() |
| Total nominal power | 5,250 kW |
| Status | Operational |
| Coordinates | Latitude 55° 13' 9.3" - Longitude 10° 44' 2.4" |
| Precise localization | No |
| City | Oksendrup |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 55° 13' 9.3" - Longitude 10° 44' 2.4" |
| Precise localization | No |
| City | Oksendrup |
| Commissioning | ![]() |
| Turbines | 3x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 450 kW |
| Status | Dismantled (2014/12) |
| Coordinates | Latitude 55° 13' 9.3" - Longitude 10° 44' 2.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Svindinge (3 km) Tarup (Nyborg) (3 km) Sentved (6 km) Aeble (6 km) Galdbjerg (7 km) Ellerup (7 km) Ellerup By - Gudbjerg (7 km) Refsvindige (8 km) Gislev (8 km) Gudbjerg (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Nyborg (Syddanmark) : 27.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||