Ullerup (Nordfyn) (Denmark)| Ullerup (Nordfyn) (Denmark) |
|
| Operational (3 MW) - Dismantled (0,3 MW) |

| Country | Denmark |
| County/Zone | Nordfyn (Syddanmark) |
| City | Ullerup |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 3 MW commissioned |
![]() | 0.15 MW decommissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Nordtank NTK600/43 (x 5) |
| Dismantled | Nordtank 150XLR (x 2) |

![]() | |

| City | Ullerup |
| Commissioning | ![]() |
| Turbines | 5x Nordtank NTK600/43 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordinates | Latitude 55° 30' 26" - Longitude 10° 14' 10.6" |
| Precise localization | Yes |
| City | Ullerup |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2016/09) |
| Coordinates | Latitude 55° 30' 41.4" - Longitude 10° 15' 0.5" |
| Precise localization | No |
| City | Ullerup |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2016/09) |
| Coordinates | Latitude 55° 30' 41.4" - Longitude 10° 15' 0.5" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Uggerslev (5 km) Hemmerslev (5 km) Bladstrup (5 km) Grindlose (6 km) Toderup (6 km) Hjadstrup (6 km) Esterbolle (6 km) Esterbolle - Særslev (6 km) Fremmelev (7 km) Moderup (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Nordfyn (Syddanmark) : 23.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 April 2019 |
||