[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Rumont 1
- City: Rumont, Vavincourt
- Commissioning:

- 6 turbines: Repower MM82 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Maïa Eolis
- Operator: Engie
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, April 18 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.1 %
- Expected production: 6,180 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Rumont 1
- City: Rumont, Vavincourt
- Commissioning:

- 1 turbine: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Maïa Eolis
- Operator: Engie
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, April 18 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.6 %
- Expected production: 290 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Rumont 1
- Latitude: 48° 49' 37.5"
- Longitude: 5° 15' 18.8"
- Altitude: 313/341 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Rumont 1
- Latitude: 48° 49' 37.5"
- Longitude: 5° 15' 18.8"
- Altitude: 313/341 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 September 2019
Complete/correct this sheet: