[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Outeiro
- Commissioning:

- 1 turbine: Nordex N90/2300 (power 2 300 kW, diameter 90 m)
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Generg
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 70.6 %
- Expected production: 38,960 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Outeiro
- Commissioning:

- 8 turbines: Nordex N90/2300 (power 2 300 kW, diameter 90 m)
- Total nominal power: 18,400 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Generg
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 63 %
- Expected production: 278,210 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Outeiro
- Commissioning:

- 6 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 55.5 %
- Expected production: 183,740 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 45' 0"
- Longitude: -8° 52' 11.9"
- Altitude: 440 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 45' 28.3"
- Longitude: -8° 49' 3.2"
- Altitude: 440 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 41° 45' 24.2"
- Longitude: -8° 48' 29.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 29 December 2020
Complete/correct this sheet: