Wind farms
Sierra de Tineo (Spain)| Sierra de Tineo (Spain) |
|
| Operational (44 MW) |

| Coordinates | Latitude 43° 21' 16.9" - Longitude -6° 24' 56.6" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Pico Gallo (5 km) Verdigueiro (8 km) Sierra de Bodenaya (11 km) Belmonte (13 km) Curiscao Fase II (16 km) Curiscao Fase I (16 km) Capiechamartin (18 km) Baos y Pumar Fase II (20 km) Baos y Pumar Fase I (20 km) Buseco (21 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Asturias : 698.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 January 2025 |
||