Wind farms
Armistead (United-Kingdom)| Armistead (United-Kingdom) |
|
| Operational (12,3 MW) |

| Coordinates | Latitude 54° 16' 30.5" - Longitude -2° 38' 15" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() United-Kingdom (104.8 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lambrigg (7 km) Caton Moor (23 km) Caton Moor Repowering (23 km) Lancaster University (30 km) Heysham Moss (31 km) Heysham South (31 km) Kirkby Moor (34 km) Harlock Hill (34 km) Mean Moor (34 km) Askam (36 km) | ||
|
Insights Production capacity United-Kingdom : 32,894.0 MW (end of 2025) Cumbria (England) : 258.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 May 2026 |
||