Wind farms
Helligso (Denmark)| Helligso (Denmark) |
|
| Operational (0,675 MW) - Dismantled (0,875 MW) |

| Coordinates | Latitude 56° 42' 6.5" - Longitude 8° 20' 54.1" |
| Precise localization | No |
| Coordinates | Latitude 56° 42' 6.5" - Longitude 8° 20' 54.1" |
| Precise localization | No |
| Coordinates | Latitude 56° 42' 6.5" - Longitude 8° 20' 54.1" |
| Precise localization | No |
| Coordinates | Latitude 56° 42' 6.5" - Longitude 8° 20' 54.1" |
| Precise localization | No |
| Coordinates | Latitude 56° 42' 6.5" - Longitude 8° 20' 54.1" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Gettrup (2 km) Sindrup (2 km) Kobbero (2 km) Gundtoft-Gettrup (2 km) Flarup (2 km) Gundtoft (4 km) Ydby (4 km) Vestervig (7 km) Nissum Bredning (7 km) Grurup (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Thisted (Nordjylland) : 360.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||