Wind farms
Minas (Uruguay)| Minas (Uruguay) |
|
| Operational (42 MW) |

| Coordinates | Latitude -34° 27' 40.6" - Longitude -55° 19' 0" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() Uruguay (1.6 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Solis de Mataojo (30 km) Los Caracoles II (38 km) Los Caracoles I (38 km) Maldonado II (40 km) Engraw (49 km) R del Sur (53 km) Carapé II (57 km) Carapé I (58 km) Agroland (67 km) Florida (83 km) | ||
|
Insights Production capacity Uruguay : 1,516.0 MW (end of 2025) Lavalleja : 42.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 January 2026 |
||