Wind farms
El Canto (Spain)| El Canto (Spain) |
|
| Operational (20,28 MW) |

| Coordinates | Latitude 42° 53' 59.9" - Longitude -3° 41' 23.9" |
| Precise localization | No |
| Part | Ampliación |
| Coordinates | Latitude 42° 53' 59.9" - Longitude -3° 41' 23.9" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms La Torada Ampliación (5 km) La Torada (5 km) El Cerro (5 km) Peña Alta (10 km) La Cotera (11 km) La Cotorra (13 km) La Peñuca (13 km) Otero y Peña la Cuesta (14 km) La Mesa (ES) (14 km) Peña Alta Ampliación (14 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Burgos (Castilla y Leon) : 2,389.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||