Wind farms
El Cabezo (Spain)| El Cabezo (Spain) |
|
| Operational (49,4 MW) |

| Part | Fase 1 |
| Coordinates | Latitude 41° 32' 23.9" - Longitude -0° 59' 47.4" |
| Precise localization | No |
| Part | Fase 2 |
| Coordinates | Latitude 41° 32' 23.9" - Longitude -0° 59' 47.4" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (54.0 GW) Europe (660.0 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Portillo 2 Fase 2 (0 km) Portillo 2 Fase 1 (0 km) Cerro de Atalaya (4 km) Los Labrados (5 km) Plana de la Balsa (6 km) La Plana III (7 km) La Plana I (7 km) Plana de Maria (8 km) Plana de Zaragoza (8 km) La Plana II (8 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Zaragoza (Aragon) : 4,329.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||