Wind farms
Portillo 2 Fase 2 (Spain)| Portillo 2 Fase 2 (Spain) |
|
| Operational (38 MW) |

| Coordinates | Latitude 41° 32' 23.9" - Longitude -0° 59' 47.4" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (59.9 GW) Europe (666.7 GW) World (2,490.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Cabezo (0 km) Portillo 2 Fase 1 (0 km) Cerro de Atalaya (4 km) Los Labrados (5 km) Plana de la Balsa (6 km) La Plana III (7 km) La Plana I (7 km) Plana de Maria (8 km) Plana de Zaragoza (8 km) La Plana II (8 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Zaragoza (Aragon) : 4,571.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 August 2026 |
||