Wind farms
Chayouzhong Banner Huitengxile 2 (China)| Chayouzhong Banner Huitengxile 2 (China) |
|
| Operational (453 MW) |

| Coordinates | Latitude 43° 14' 38.3" - Longitude 114° 19' 30" |
| Precise localization | No |
| Part | Part 1 |
| Coordinates | Latitude 41° 43' 4.8" - Longitude 112° 36' 7.2" |
| Precise localization | No |
| Part | Part 2 |
| Coordinates | Latitude 41° 44' 2.4" - Longitude 112° 35' 16.7" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() China (683.2 GW) Asia (1,032.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Qahar Right Rear Banner Source Load Data Center (43 km) Chayouzhong Banner (45 km) Wulanchabu Hongge’er (45 km) Chayouhou Banner Hanwula (49 km) Siziwang Banner Xingfu (49 km) Siziwang Banner Xiari (53 km) Chayouhou Bannner Huitengxile 5 (54 km) Hongmu II (59 km) Bayinxile V (61 km) Chayouzhong Banner Huitengxile (61 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Inner Mongolia : 118,967.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 October 2020 |
||